Vorsitzende der Sitzung
Radioactive Isotope Beam Facilities
- Christoph Scheidenberger (GSI)
-
16.10.14, 11:15
-
Bradley Sherrill (MSU)16.10.14, 11:25This talk will review the current status of the FRIB project, its planned capabilities, and provide a broad outline of the scientific program. FRIB will be based on a superconducting LINAC that will be able to deliver 400kW beam power of at least 200 MeV/u ions for all stable isotopes. The accelerator and facilities are upgradeable to 400 MeV/u by addition of cryomodules into unused space. The...Go to contribution page
-
Toshiyuki Kubo (RIKEN)16.10.14, 11:50The RI Beam Factory (RIBF) [1] at RIKEN, which became operational in March 2007, is one of the next-generation in-flight rare isotope (RI) beam facilities. At RIBF the BigRIPS in-flight separator [2] has been used to produce a variety of RI beams by using in-flight fission as well as projectile fragmentation. Its major features are two-stage structure, large ion-optical acceptances, and...Go to contribution page
-
Marek Lewitowicz (GANIL)16.10.14, 12:15