13.–17. Okt. 2014
Das Wormser
Europe/Berlin Zeitzone

Sitzung

Parallel Tier 1

15.10.2014, 14:00
Mozartsaal (Das Wormser)

Mozartsaal

Das Wormser

Das Wormser, Rathenaustraße 11, 67547 Worms, ‎ Tel: 06241/2000420

Vorsitzende der Sitzung

Parallel Tier 1

  • Haik Simon (GSI)

Präsentationsmaterialien

Es gibt derzeit keine Materialien.

  1. Winfried Barth (GSI)
    15.10.14, 14:00
    An UNILAC-upgrade program will be realized until FAIR commissioning starts, providing for the high heavy ion beam currents as required for the FAIR project. A new ion source terminal and a low energy beam line are dedicated to increase the primary low charge uranium beam intensity. Additionally an injector (HSI) upgrade programme is scheduled to improve beam transmission as well as beam...
    Go to contribution page
  2. Danyal Winters (GSI)
    15.10.14, 14:35
  3. Stepan Yaramyshev (GSI)
    15.10.14, 15:00
    Almost all modern linacs include a Radio-Frequence Quadrupole (RFQ) as a dedicated section for the bunching of continuous beam and simultaneous pre-acceleration of the ions. Generally an RFQ has a strong influence on the beam quality and a performance of the whole facility. Therefore, proper design of the accelerating-focusing RFQ channel, as well as a correct beam matching to an RFQ...
    Go to contribution page
  4. Ralph Hollinger (GSI)
    15.10.14, 15:30
Erstelle Zeitplan ...