30. August 2015 bis 4. September 2015
MartiniPlaza Congress Center
Europe/Berlin Zeitzone

Beam optic along the transfer RIB lines to the DESIR facility at GANIL-SPIRAL2

03.09.2015, 16:30
1 h 30m
MartiniPlaza Congress Center

MartiniPlaza Congress Center

Leonard Springerlaan 2, 9727 KB Groningen
Gremium: 5
Poster Poster

Sprecher

Luc Perrot (CNRS/IN2P3/IPNO)

Beschreibung

The new ISOL facility SPIRAL2 is currently being built at GANIL, Caen France. SPIRAL2 will produce a large number of new radioactive ion beams (RIB) at high intensities. In 2019, the DESIR facility will receive beams from the upgraded SPIRAL1 facility of GANIL (stable beam and target fragmentation), from the S3 Low Energy Branch (fusion-evaporation and deep-inelastic reactions). In order to deliver the RIB to the experimental set-ups installed in the DESIR hall, 110 meters of beam line are studied since 2013. This paper will focus on the recent studies which have been done on these transfer lines: beam optics and errors calculations, quadrupoles, diagnostics and mechanical designs.

Hauptautor

Luc Perrot (CNRS/IN2P3/IPNO)

Präsentationsmaterialien

Es gibt derzeit keine Materialien.