Visit to FAIR construction site

Europe/Berlin
Beschreibung
Pictures taken by Juergen Eschke in the occasion of a Site Visit of the APPA collaboration.
    • 1
      Transfer Building
      pictures
    • 2
      Rebar steel
      For various reasons we have an unusually high fraction of reinforcing steel. More than 60000 t will be used during shell construction, and each site visit is a good opportunity for impressive closeups.
      close-up, 10cm mesh width
      status before floor is cast
    • 3
      CBM Cave
      The main part of the CBM cave is fully excavated and the ground is prepared for the floor slab.
      heads of foundation pillars
      View of CBM cave area