Agenda of the Meeting:
1. Update on shutdown Status: P. Schütt, 10 min
2. UNILAC RF status: G. Schreiber, 20 min
- LINAC RF Gallery
- Potential tests of HSI RFQ during shutdown
3. Dryrun plans of the FAIR control: H. Hüther, 15 min
4. Round table report on machine Progress: MKs 60 min
5. Any other business