src@hades workshop

Europe/Berlin
KBW Lecture hall (GSI)

KBW Lecture hall

GSI

Teilnehmer
  • Daniel Koerper
  • Dimitar Mihaylov
  • Eliazer Piasetzky
  • Erwin Schwab
  • Georgios Laskaris
  • Georgy Kornakov
  • Jan Michel
  • Jerzy Pietraszko
  • Joachim Stroth
  • Jörn Adamczewski-Musch
  • Konstanze Boretzky
  • Malgorzata Gumberidze
  • Michael Traxler
  • Or Hen
  • Romain Holzmann
  • Tetyana Galatyuk
  • Thomas Aumann
  • Montag, 13 Februar at 13:00
    • SRC@HADES 1. DAY: 1st day
      • 1
        SRC overview with motivation for p beam
        Sprecher: Dr. Or Hen (MIT)
        Slides
      • 2
        SRC@HADES - the two staged approach: experimental realization
        Sprecher: Herr Georgios Laskaris (MIT)
        Slides
      • 3
        The staged approach - Physics case for phase I and II
        Sprecher: Prof. Eliazer Piasetzky (Tel Aviv University)
      • 14:30
        Coffee break
      • 4
        NeuLand detector – performance
        Sprecher: Dr. Konstanze Boretzky (GSI Helmholtzzentrum für Schwerionenforschung GmbH)
      • 5
        Magnetic field in NeuLand region
        Sprecher: Juergen Friese (TU München)
        Slides
      • 6
        RICH influence on neutron detection
        Sprecher: Romain Holzmann (GSI, Darmstadt)
        Slides
      • 7
        RICH700 material budget in backward region
        Sprecher: Juergen Friese (TU München)
        Slides
      • 8
        HADES upgrade projects
        Sprecher: Jerzy Pietraszko (GSI, Darmstadt)
      • 9
        Challenges at running at 7*10^7 protons / s
        Sprecher: Jerzy Pietraszko (GSI, Darmstadt)
        Slides
      • 16:30
        Coffee break
      • 10
        HADES p+Nb physics case
        Sprecher: Prof. Tetyana Galatyuk (TU Darmstadt / GSI)
        Slides
      • 11
        HADES femto project
        Sprecher: Dimitar Mihaylov (TU Munich)
        Slides
  • Dienstag, 14 Februar at 09:00
    • SRC@HADES 2. DAY, Round-Table discussion, project planning
      • 12
        Visit in HADES/R3B caves
      • 13
        Trigger concept for stage 1 run (parallel run) - discussion
      • 14
        NeuLand readout integration - discussion
      • 10:30
        Coffee break
      • 15
        NeuLand installation in HADES cave, needed modification in construction for HADES cave - discussion
      • 16
        Mechanics for neutron detector and Neutron detector side parts- discussion
      • 12:00
        Lunch break
      • 17
        Needed simulations, task lists, responsibilities - discussion
      • 18
        Timescale of the project
      • 19
        Open topics .... - discussion