Webseminar 20

Europe/Berlin
    • 08:30 08:50
      Update from Mainz: Status of the installation of KAOS 20m
      • KAOS moved to in-beam position
      • fine-positioning using rotational laser will be finished this week
      • leveling of KAOS will be done at the same time

      • work on the detectors starting next week (from 7.6.22)

      Speaker: Philipp Eckert (KPH Mainz)