Status Update B-TOF, Sebastian Zimmermann, Vienna The new PCB with the alternative material to FP4 were produced in China and will be shipped soon. The rail board carbon holding structure has been successfully produced. The sheet thickness of 1mm can be reduced further to get a stiff structure. He showed results from the CERN beam time in 2018. Current Status of the FTOF Wall Detector, Gleb Fedotov, PNPI The originally foreseen PMT R2083 from Hamamatsu might be not available anymore in future. Therefore a new, similar tube (R13435) was tested in beam. With the knowledge of the hit position a timing precision of 60ps was achieved. This precision deteriorates to 90ps when the hit position is unknown.