src@hades workshop
13.02.2017, 08:00
→
14.02.2017, 18:00
Europe/Berlin
KBW Lecture hall (GSI)
KBW Lecture hall
GSI
Teilnehmer
Daniel Koerper
Dimitar Mihaylov
Eliazer Piasetzky
Erwin Schwab
Georgios Laskaris
Georgy Kornakov
Jan Michel
Jerzy Pietraszko
Joachim Stroth
Jörn Adamczewski-Musch
Konstanze Boretzky
Malgorzata Gumberidze
Michael Traxler
Or Hen
Romain Holzmann
Tetyana Galatyuk
Thomas Aumann
Montag, 13 Februar at 13:00
Mo., 13 Feb.
Di., 14 Feb.
SRC@HADES 1. DAY: 1st day
1
SRC overview with motivation for p beam
Sprecher
:
Dr.
Or Hen
(
MIT
)
Slides
2
SRC@HADES - the two staged approach: experimental realization
Sprecher
:
Herr
Georgios Laskaris
(
MIT
)
Slides
3
The staged approach - Physics case for phase I and II
Sprecher
:
Prof.
Eliazer Piasetzky
(
Tel Aviv University
)
14:30
Coffee break
4
NeuLand detector – performance
Sprecher
:
Dr.
Konstanze Boretzky
(
GSI Helmholtzzentrum für Schwerionenforschung GmbH
)
5
Magnetic field in NeuLand region
Sprecher
:
Juergen Friese
(
TU München
)
Slides
6
RICH influence on neutron detection
Sprecher
:
Romain Holzmann
(
GSI, Darmstadt
)
Slides
7
RICH700 material budget in backward region
Sprecher
:
Juergen Friese
(
TU München
)
Slides
8
HADES upgrade projects
Sprecher
:
Jerzy Pietraszko
(
GSI, Darmstadt
)
9
Challenges at running at 7*10^7 protons / s
Sprecher
:
Jerzy Pietraszko
(
GSI, Darmstadt
)
Slides
16:30
Coffee break
10
HADES p+Nb physics case
Sprecher
:
Prof.
Tetyana Galatyuk
(
TU Darmstadt / GSI
)
Slides
11
HADES femto project
Sprecher
:
Dimitar Mihaylov
(
TU Munich
)
Slides
Dienstag, 14 Februar at 09:00
Mo., 13 Feb.
Di., 14 Feb.
SRC@HADES 2. DAY, Round-Table discussion, project planning
12
Visit in HADES/R3B caves
13
Trigger concept for stage 1 run (parallel run) - discussion
14
NeuLand readout integration - discussion
10:30
Coffee break
15
NeuLand installation in HADES cave, needed modification in construction for HADES cave - discussion
16
Mechanics for neutron detector and Neutron detector side parts- discussion
12:00
Lunch break
17
Needed simulations, task lists, responsibilities - discussion
18
Timescale of the project
19
Open topics .... - discussion