SFRS Workshop: control needs, operation concept
Thursday 5 Sep 2024, 09:00
→
23:20
Europe/Berlin
KBW Lecture Hall (GSI)
KBW Lecture Hall
GSI
Planckstraße 1, 64291 Darmstadt
Stephane Pietri
(GSI Helmholtzzentrum für Schwerionenforschung GmbH(GSI))
PreliminaryAgendav04.pdf
Registration
Participants
19
Register
Participants
Alexander Herlert
Andrea Wilms
Andreas Reiter
David Ondreka
Erika Kazantseva
Frederic Ameil
Haik Simon
Hanno Hüther
Helena May Albers
Helmut Weick
Jan Wirtz
JianPing Fan
Jonas Pforr
Jutta Fitzek
Marcus Schwickert
Maximilian Schütt
Ralf Heinz Gebel
Ralph Bär
Stephane Pietri
09:00
→
09:05
Introduction, aim of the workshop
5m
Speaker
:
SPL, Organzier
09:05
→
10:50
General information Super-FRS
09:05
Super-FRS, selection and identification
30m
Speaker
:
Stephane Pietri
09:35
Super-FRS Target area
20m
Speaker
:
Helmut Weick
(GSI Helmholtzzentrum für Schwerionenforschung GmbH(GSI))
09:55
Super-FRS Ion Optical layout
20m
Speaker
:
Erika Kazantseva
(GSI Helmholtzzentrum für Schwerionenforschung GmbH(GSI))
10:15
Super-FRS DAQ for detectors and diagnostics
15m
Speaker
:
Stephane Pietri
(GSI Helmholtzzentrum für Schwerionenforschung GmbH(GSI))
10:30
Super-FRS - Experimental places
20m
Speaker
:
Helena May Albers
(GSI Helmholtzzentrum für Schwerionenforschung GmbH(GSI))
10:50
→
11:10
Coffee Break
20m
11:10
→
12:00
Super-FRS specifics control requirement, operation concept
11:10
Super-FRS operation concepts
25m
Speaker
:
Stephane Pietri
(GSI Helmholtzzentrum für Schwerionenforschung GmbH(GSI))
11:35
Super-FRS control phase 0: FRS controls
10m
Speaker
:
Stephane Pietri
(GSI Helmholtzzentrum für Schwerionenforschung GmbH(GSI))
11:45
Commissioning needs
15m
Speaker
:
Stephane Pietri
(GSI Helmholtzzentrum für Schwerionenforschung GmbH(GSI))
12:00
→
13:00
Lunch Break
1h
13:00
→
16:00
Detailed discussion points: Detailed discussion points:
13:00
Front end (SFR)
30m
requst to Industiral Control
Phytron control
NMR control
13:30
Machine Model status/development (WPL SFRS Data Supply)
30m
14:00
MPS and interlock
20m
Speaker
:
Frederic Ameil
14:20
RBAC implementation/constrain (SFR)
20m
14:40
Applications BEA at Super-FRS (BEA)
30m
update of current applications (Lassie, grid readout ...)
interface to BEA applications
15:10
High level applications (ACO)
20m
Saving good setting
webdav?
15:30
High level applications (SFR)
30m
DAQ coupling to controls
Control check through simulation, Setting Validation system
Setting Protection System