PID TOF Session at CM 21/1

Europe/Berlin
online

online

PID-TOF subgroup meeting, Wednesday, 10th March, 16:30h

Sebastian Zimmermann, SMI Vienna, Status Update B-TOF

He showed the last measurements of amplitude attenuation
and signal rise time increase with the railboard.
The measurements with the railboard were summarized and a document
which contains the BTOF status is in preparation. In addition, many
details are described in Sebastians PhD-thesis. SMI stops the development
of the Barrel-TOF and new groups for the continuation are searched.
 

Es gibt eine zugehörige Notiz zu dieser Veranstaltung Anzeigen.