Displaying 29 contributions out of 29
- Are all parts in technical drawings? Data base status. - Padplane variants [segmentation, closing of vias] - Gas connectors
Presented by Philipp KÄHLER, Florian ROETHER on 27 Mar 2019 at 2:10 PM
- production process ms/f: working steps, materials, tooling and room requirements - pieces produced per working step and storage sizes in split production procedures - number of spare modules produced [respect ALICE experiences]
on 28 Mar 2019 at 10:00 AM
on 27 Mar 2019 at 3:40 PM
on 29 Mar 2019 at 10:00 AM
Presented by Alexandru BERCUCI on 28 Mar 2019 at 6:15 PM
Presented by Philipp KÄHLER on 28 Mar 2019 at 5:15 PM
Presented by David SCHMIDT on 28 Mar 2019 at 5:00 PM
Presented by Mrs. Laura RADULESCU on 27 Mar 2019 at 3:10 PM
Presented by Mariana PETRIS on 28 Mar 2019 at 9:00 AM
Presented by Christoph BLUME on 28 Mar 2019 at 9:20 AM
Presented by Lukas WAHMES on 28 Mar 2019 at 9:40 AM
Presented by Philipp KÄHLER, Florian ROETHER on 28 Mar 2019 at 11:00 AM
- LV converter order and commissioning - LV distribution planning [bars/cables, PDBs] - HV structure, HV filter board [new design from Roland] - Cooling test status - DCS ... ? - Support structure segment prototype and chamber integration tester [parts ordered, assembly when the hall is usable again] - Maintenance case of the TRD in CBM
Presented by Florian ROETHER, Philipp KÄHLER on 27 Mar 2019 at 4:30 PM
Presented by Philipp KÄHLER, Florian ROETHER on 28 Mar 2019 at 2:00 PM
Presented by Alexandru BERCUCI on 29 Mar 2019 at 9:30 AM
- Reconstruction software: status and prospects - Comparison test beam and detector simulation
Presented by Etienne BECHTEL on 29 Mar 2019 at 9:00 AM
Presented by Christoph BLUME on 27 Mar 2019 at 2:00 PM